Piping Maintenance Pipelines-completed Client: Eni Iraq / Ministry of Oil Location: Iraq Value: 2,800,000 USD Starting Work: 2012 Share This Tweet Share Share Email Related Posts Design, Construction of 12KM Water Pipeline – Size 10” Client: Council of the Governorate of Basra Location: Kubbaisa, Basrah Value: 1,330,000.00 USD Work Period:… Pipeline Installation Client: SOC / Ministry of Oil Location: Iraq Value: 36,000,000 USD Starting Work: 2010 Piping Maintenance Client:Eni Iraq B.V Location: Zubair Value: Call Off Work Period: Mar 2012 - March 2014
Design, Construction of 12KM Water Pipeline – Size 10” Client: Council of the Governorate of Basra Location: Kubbaisa, Basrah Value: 1,330,000.00 USD Work Period:…
Pipeline Installation Client: SOC / Ministry of Oil Location: Iraq Value: 36,000,000 USD Starting Work: 2010
Piping Maintenance Client:Eni Iraq B.V Location: Zubair Value: Call Off Work Period: Mar 2012 - March 2014