EPC School Construction education-completed Client: Missan Governorate Location: Missan Value: 500,000.00 USD Work Period: 2008 (300 days) Share This Tweet Share Share Email Related Posts Design, Procurement and Construction of University Building including Underground Utilities & Infrastructure Client: Iraq University College Location: Basrah Value: 7,350,000.00 USD Work Period: March 2013 – 2018 Building a primary school in Missan Al-BasrahEurolane was contracted by the governorate of Missan to construct a primary school. Works Included… Construction of the Shatt Al Arab College BECO supported the efforts of the College on an Engineering, Procurement and Construction (EPC) basis,…
Design, Procurement and Construction of University Building including Underground Utilities & Infrastructure Client: Iraq University College Location: Basrah Value: 7,350,000.00 USD Work Period: March 2013 – 2018
Building a primary school in Missan Al-BasrahEurolane was contracted by the governorate of Missan to construct a primary school. Works Included…
Construction of the Shatt Al Arab College BECO supported the efforts of the College on an Engineering, Procurement and Construction (EPC) basis,…