Fire Fighting System Network Mechanical-completed Client: Eni Iraq B.V Location: Zubair Value: Call Off Work Period: Apr 12 – Apr 14 Share This Tweet Share Share Email Related Posts Fire Fighting System Network Client: Eni Iraq / Ministry of Oil Location: Iraq Value: 3,100,000 USD Starting Work: 2012 Fadhili GAS PLANT 6 No. Sulfur Pits Client: Aramco Location: KSA Value: 10,670,000 USD Starting Work: 2017 Mechanical and Piping (M&P) + civil foundation – 16″ and other size network piping – firefighting system Client: Eni Iraq B. V Location: Zubair Oil Field, Basra Value: 3,898,900 USD Starting Work:…
Fire Fighting System Network Client: Eni Iraq / Ministry of Oil Location: Iraq Value: 3,100,000 USD Starting Work: 2012
Fadhili GAS PLANT 6 No. Sulfur Pits Client: Aramco Location: KSA Value: 10,670,000 USD Starting Work: 2017
Mechanical and Piping (M&P) + civil foundation – 16″ and other size network piping – firefighting system Client: Eni Iraq B. V Location: Zubair Oil Field, Basra Value: 3,898,900 USD Starting Work:…